9-14 Jul. The garage side retaining wall forms were set up and concrete applied to finish up the this end of the house (with the exception of the garage driveway). Ralph and Ruben got with the program and Ralph is pictured here filling in the retaining wall with fill dirt to bring the earth level up on this side. Next week, painting begins, rockwork sees some finishing, barrel vaults get flashed to the walls, and interior tiling begins.
No comments:
Post a Comment